Sir Sanford Fleming College – Frost Campus
Lindsay, ON
Project Details
Location
Lindsay, ON
Client
Sir Sandford Fleming College
Project Type
Completion Date
September 2007
Contract Type
General Contracting
Project Overview
This project involved the replacement of their HVAC systems at the Lindsay Campus. The project had to be completed while the building remained operational. There was extensive coordination required in order to ensure equipment would fit within the existing conditions.